There is no universal electrical drawing package. The drawings, diagrams and calculations should reflect the systems affected by the project, the existing electrical conditions and the approval route being used.
Depending on the scope, the package may need to document power distribution and single-line information, including services, panels, feeders and major equipment connections. A single-line diagram is required for every ESA Plan Review submission.
The design may also require a load and capacity assessment to confirm that existing and proposed loads are compatible with the service, panels, feeders and equipment being used. Power layouts should coordinate receptacles, dedicated circuits, disconnects and equipment connections with the latest architectural and equipment plans.
For projects that affect lighting or life-safety systems, the package may include lighting, switching, controls, emergency lighting, fire alarm or emergency-power information, depending on the building and project scope.
Electrical design also needs to coordinate with other disciplines. HVAC equipment, commercial kitchens, pumps, controls, electric heating, EV infrastructure and specialty equipment can introduce loads and connection requirements that need to match the latest project information.