◆ Residential demolition permit

Demolition Permit Coordination for Toronto Replacement Homes

Tearing down an existing house before a replacement build? iPermit coordinates the residential demolition permit documents with the new-house application so the removal and rebuild are planned as one municipal approval sequence.

What Happens After Demolition Determines the Permit Route

Toronto does not treat every residential demolition as the same file. The replacement plan and existing occupancy can change who reviews the application and what has to happen before a permit can be issued.
Your situation Permit route What matters early
Existing house → replacement house Toronto has a dedicated Residential Demolition Permit route for a house being removed so a new house can be built. The demolition file is tied to the new-house application, current survey/grading information and demolition-control forms.
Residential building → no replacement building yet The City’s standard replacement-building guide does not apply. Toronto directs these applicants to the responsible district office, and demolition control can require Community Council consideration. Do not assume the normal replacement-home sequence or timeline applies.
Rental property with six or more dwelling units Property with six or more existing dwelling units, including at least one rental unit

Toronto’s Rental Housing Demolition and Conversion requirements can apply in addition to the building and demolition permits. Rental replacement, tenant assistance and other conditions may need to be resolved before demolition is allowed.

For the typical teardown-and-rebuild homeowner, the first route is the core iPermit service on this page. The other routes are identified early so a property is not pushed into the wrong permit workflow.
◆ The empty lot is not the end goal

What Toronto Requires for a Replacement-House Demolition

Toronto’s current replacement-building demolition guide is specifically for removing an existing house so a new house can be built on the site. The City instructs applicants to submit the demolition application after the New House permit application has been submitted.

Replacement-building status also matters under demolition control. When no replacement building permit has been issued, current Toronto cases can be referred to Community Council to decide whether the residential demolition should be approved, refused or approved with conditions.

For a teardown rebuild, that makes the practical handoff important: the demolition file should use the same property information and replacement strategy as the New House Permit file rather than becoming a separate paperwork exercise.

Demolition Permit

For a Toronto Replacement House, the Demolition File Is Mostly Site Information and Control Forms

The current City of Toronto replacement-building demolition guide asks for a survey or a grading plan referenced to a current survey showing the existing house, property lines and lot area.

The required forms currently include:

  • Application for a Permit to Construct or Demolish
  • Residential Infill Public Notice Declaration
  • Owner’s Acknowledgement of Demolition Control Conditions
  • Municipal Road Damage Form / required deposit process
  • Schedule 1: Designer Information Form, where applicable
  • Tree Declaration Form where there is potential for damage to private or City trees
  • Demolition Permit Application Checklist: Used to confirm the demolition review requirements, including whether structural or additional environmental documentation is required.

Heritage status should also be checked before demolition is treated as routine. A designated property or a property within a Heritage Conservation District can require separate Heritage Planning approval before demolition or removal is allowed.

Ready to Define Permit Path?

Send project context first, the next step can then focus on scope, information gaps and the right page or service route.

Permit Coordination and Physical Demolition Are Separate

Search results for demolition are dominated by contractors because many owners need both the permit and the teardown. iPermit’s service is narrower: we coordinate the municipal permit/document side of the project.

Within the permit scope: reviewing the property and replacement-build status, organizing the required demolition submission documents, coordinating the demolition application with the replacement-house file and responding to applicable municipal document comments within the agreed assignment.

Outside the permit-consulting scope unless separately confirmed: physical demolition, temporary construction protection, utility disconnections, hazardous-material assessment or abatement, debris hauling, excavation, backfill and contractor site-safety obligations.

This separation matters because a demolition permit does not replace the contractor’s legal, environmental, utility and site-safety responsibilities. The permit file and the demolition contractor still need to be sequenced around the same approved project.

For rental buildings with six or more existing dwelling units, the City’s Rental Housing Demolition and Conversion guidance describes a separate Chapter 667 approval that can apply in addition to other permits. A typical single-house teardown is not the same approval problem.

◆ Tell us what exists—and what replaces it

What to Send for a Demolition Permit Review

Start with the current building and the status of the replacement project. That is more useful for demolition permit scoping than sending a generic demolition quote or contractor estimate.

Property address
Current survey
Replacement status
◆ Demolition control questions

Residential Demolition Permit FAQs

These questions focus on the issues that make demolition different from an ordinary construction permit: the replacement building, demolition control and occupancy of the existing property.

Yes. Toronto lists demolition or removal of all or part of a building as work that requires a permit. For a house being removed for a replacement house, the City has a dedicated Residential Demolition Permit application route.

Toronto’s 2026 demolition fee uses a service index of $0.18 per square metre for all building and occupancy types. The City’s general building-permit fee schedule also applies a minimum permit fee of $214.79 for all work, so the minimum can control the fee for a typical residential demolition.

If the demolition requires an Environmental Review, Toronto currently lists an additional fee of $1,030.99. Other deposits, approvals and replacement-house permit fees are separate.

Toronto requires a permit to demolish or remove all or a portion of a building. The City’s published replacement-house demolition guide is specifically for removing an existing house before a new house is built, so partial demolition or removal of another residential structure can follow different documentation and review requirements.

Send the property and demolition scope first so the correct permit route can be confirmed before preparing a replacement-house demolition package.

Toronto’s current replacement-building guide tells applicants to submit the demolition application after the New House permit application has been submitted. Whether the demolition permit can be issued at a particular stage depends on the replacement-building status and demolition-control requirements, so the two files should be coordinated.

The City’s published replacement-building guide does not apply to that situation. Toronto directs applicants with no replacement building to the responsible district office, and current demolition-control cases can be referred to Community Council for a decision.

Toronto currently asks for a survey or survey-referenced grading plan showing the existing house, property lines and lot area, plus the demolition application, Residential Infill Public Notice Declaration, Owner’s Acknowledgement of Demolition Control Conditions, Municipal Road Damage requirements, Schedule 1 where applicable and a Tree Declaration where trees may be affected.

It can. Toronto’s Chapter 667 Rental Housing Demolition and Conversion process can apply where a proposal involves six or more existing dwelling units and rental housing. That approval is additional to other demolition/building approvals.

No. iPermit’s service is the permit/document coordination side of the project. Physical demolition, utility disconnections, hazardous-material work, site protection, hauling and excavation are contractor or specialist responsibilities unless separately confirmed outside this service.